Typically, rough plumbing involves installing all sewer lines and vents as well as all water supply lines for each fixture. Here's a typical sink fixture:
![]() |
Here's the fixture for a washer:
![]() |
The tub is put in place and filled. Note the framing problem being corrected on the left side of the tub because the tub changed size:
![]() |
Here are the lines for the tub:
![]() |
In the crawl space, the supply lines all branch off from common pipes running the length of the house:
![]() |
The sewer lines all join together...
![]() |
... and then exit out the back of the house, ready for connection to the septic tank:
![]() |